Custom Deck Building
Redwood, cedar, and composite decks engineered for Granite Bay's slopes, oaks, and hot summers.

18 yrs
Building decks in Placer County
200+
Decks designed and installed
10 yr
Workmanship warranty, in writing
One crew from design through final inspection — we don't hand your backyard to a rotating cast of subs.
Redwood, cedar, and composite decks engineered for Granite Bay's slopes, oaks, and hot summers.
Dry rot, failing ledgers, sagging joists, and wobbly railings rebuilt to current code.
Covered patios, pergolas, and louvered shade so the deck is usable in August, not just April.
Cable rail, black aluminum, and integrated low-voltage lighting for safe evenings outside.



Every material behaves differently in Placer County heat. Here's a close look at what each one actually looks like underfoot — we bring physical samples of all eight to your free estimate.

Wood fiber and recycled polymer capped in a protective shell. No sealing, no splinters, and it holds its color through Granite Bay summers.

The best-known composite line. Deep streaked grain, a 25-year fade-and-stain warranty, and the widest color range we install.

The most convincing wood look in the category. Cooler underfoot than most composites — a real advantage on west-facing backyards.

All-polymer, zero wood content. The lightest, most moisture-proof option — ideal over living space, spas, and poolside decks.

The value workhorse. Rot- and insect-resistant framing and decking at the lowest cost per square foot — plan on staining every couple of years.

Naturally rot-resistant, light, and stable. Warm amber tone that silvers gracefully if you'd rather skip the maintenance schedule.

The classic Northern California deck. Clear-heart redwood stays cool underfoot and looks unbeatable — re-seal every two to three years.

Tropical hardwood so dense it's rated like steel for fire and wear. A 40-year deck for owners who want the very top of the material list.
01
Tell us the basics. We answer the phone during business hours.
02
We measure, check grade and drainage, and bring material samples.
03
Itemized price and schedule within 72 hours. No surprise change orders.
04
Permits pulled, crew on site daily, site swept before we leave.
“They rebuilt our lakeside deck in nine days and the price never moved. The cable railing is exactly what we wanted.”
“Handled the county permit, caught dry rot our last contractor missed, and cleaned up daily. Rare crew.”
“Composite deck with a pergola — we finally use the backyard in July. Worth every dollar.”